IND-E · vertical accordion

Varjo configuration paths by deployment vertical

Open a vertical to see the dominant system boundary and the evidence expected at acceptance.

Flight and vehicle simulation

Prioritize instrument readability, seated tracking, cockpit occlusion, cable strain relief, and deterministic host performance.

Acceptance: supplied cockpit scene, 90 Hz frame-time capture, edge-text reading test, 45-minute thermal run.

Industrial design review

Balance pixel density against GPU load. CAD assemblies with transparency and high draw-call counts can expose limits hidden by game benchmarks.

Acceptance: customer assembly, annotation legibility, model-load timing, runtime/version record.

Medical and procedural training

Fit, sanitation, seated access, subtitle readability, and repeatable reset procedures can matter more than peak visual fidelity.

Boundary: this site does not make clinical-device claims; regulated use requires the buyer's own validation.

Enterprise skills training

Confirm identity workflow, offline behavior, content updates, help-desk recovery, and spare-device substitution across the fleet.

Location-based entertainment

Measure guest throughput, wipe-cycle time, cable wear, queue reset, controller loss, and operator visibility.

Trade-off: inside-out tracking reduces infrastructure, while outside-in systems can provide better coverage in purpose-built large volumes.

Education and research labs

Freeze software versions for reproducibility and retain calibration, consent, accessibility, and cleaning records.

Architecture visualization

Test large BIM scenes, fine text, teleport and walk modes, client fitting time, and display-to-host connection length.

Remote collaboration rooms

Validate voice routing, avatar latency, network bandwidth, account recovery, and the low-stim mode required for longer sessions.

Download the vertical acceptance matrix

Compare room, host, tracking, hygiene, and support requirements in one checklist.

Open the innovation lab